Production delivery checklist

Check HQControl, PostgreSQL, Redis, IO, Alarm, Trend, Event, WebSocket, IO State API, and Integration Script status. Federation and redundancy projects should also confirm topology and active collection devices.

Delivery

Delivery: Production delivery checklist

Before handover, verify health, master data, screens, menus, access control, APIs, scripts, licensing, migration backup notes, and documentation.

Runtime health

Check HQControl, PostgreSQL, Redis, IO, Alarm, Trend, Event, WebSocket, IO State API, and Integration Script status. Federation and redundancy projects should also confirm topology and active collection devices.

Master data

Verify sites, devices, tag addresses, data types, scan rates, alarm/trend flags, control permissions, and the separation between local PLC tags and federated mirror tags.

Screens and menus

Open every main menu and popup as administrator and as a normal user.

License and settings

Confirm /license is activated, signature verification is configured, and /settings reflects the target deployment.

Delivery records

Include installers, deployment notes, account ownership, license records, screen list, tag list, retention policy, migration backup notes, API notes, script notes, and diagnosis steps. Production passwords should be handed over through a password manager or sealed handover record, not written in plain text.